The right DIY customer
The useful question is not whether a kit is marketed as easy, but whether the people on site can read construction drawings, work accurately, control levels, handle panels safely and recognise when the built condition differs from the plan.
What the frame does not complete
The frame establishes structure and openings. It does not automatically provide a finished floor, thermal performance, airtightness, vapour control, waterproofing, fire or acoustic performance. Those outcomes belong to the complete designed build-up.
Prepare before ordering
Choose the room use, footprint, door and window arrangement, foundation route and access method first. Review panel size and handling, temporary support, weather protection and storage. Ordering a frame before resolving the base and envelope usually moves decisions to the most expensive moment—on site.
Where Forti Nova reduces complexity
Suitable projects can combine frame supply with ground screws, EPDM roof materials, composite cladding, roofline and rainwater products. A coordinated bill of materials reduces gaps, although installation and design responsibility must still be clearly allocated.

