Separate frame price from building price
A structural kit price is not the cost of a finished room. Confirm whether VAT, delivery, frame fixings, installation information, assembly, foundations, floor structure, sheathing and crane or handling requirements are included. A lower figure can simply describe less scope.
The variables that move the frame price
More steel, wider spans, additional structural openings, unusual geometry and bespoke engineering affect the structure. Standard footprints are easier to compare; bespoke quotations need drawings and a clear use brief before the numbers mean anything.
The site can change the total
Access restrictions, distance, ground conditions, levels and working space influence delivery and foundation work. Ground screws can reduce excavation on suitable sites, but they are not a universal shortcut and must be designed around the intended loads.
How Forti Nova prices responsibly
We ask for postcode, approximate size, intended use, openings, available drawings and required package elements. The quotation then distinguishes the frame from optional ground screw, EPDM, cladding, roofline, rainwater and PriviFilm items.

