The kerb is not the foundation
A vehicle may reach the street while panels still cannot reach the build area. Measure gates, passages, corners, steps, overhead restrictions and gradients. Identify where the delivery can stop legally and safely without assuming the driver can solve site handling.
Urban and terraced properties
Parking controls, narrow alleys, shared access, neighbours and limited storage can influence panel size and delivery timing. Early evidence helps decide whether a standard panel arrangement is practical or whether the project needs a different logistics route.
Rural and soft-ground sites
Long drives, weak surfaces, turning areas, slopes and seasonal ground conditions affect vehicle selection and unloading. Confirm who provides lifting or handling equipment and where panels can be stored flat, protected and secure.
Information that produces a useful quotation
Send the full postcode, approach photographs, measurements of the narrowest route, intended storage area and any delivery restrictions. Forti Nova can then distinguish ordinary delivery from project-specific handling requirements.

