Design from the activity, not the outside dimensions
Working wall length, Controlled daylight, Material storage, Sink or extraction routes must be plotted before a frame is selected. The useful comparison is the finished internal room after insulation, cavities and linings—not the external steel footprint.
Tell the structure and foundation what the room must carry
Kilns, presses, benches, storage and concentrated materials may require specific floor and foundation checks. Declare equipment weights, heat and electrical demand before the build-up is designed.
Control comfort, privacy and the internal environment
Artists may need stable temperature, controlled north light, blackout or extraction depending on the medium. Photography and messy crafts require very different opening, finish and service strategies.
Choose standard, bespoke or the complete Forti Nova bundle
Compare the published frame catalogue using the listed dimensions, height information and openings. If the activity needs different geometry, request a bespoke frame. Suitable projects can combine ground screw installation, frame supply and professional erection, with discounted cladding, EPDM roofing and roofline options.

