Design from the activity, not the outside dimensions
Treatment clearances, Client privacy, Water and drainage, Cleanable finishes must be plotted before a frame is selected. The useful comparison is the finished internal room after insulation, cavities and linings—not the external steel footprint.
Tell the structure and foundation what the room must carry
Identify treatment equipment, cabinetry, basins and any heavy devices. Water, drainage and electrical routes can affect the floor, foundation and frame penetrations and should not be improvised after erection.
Control comfort, privacy and the internal environment
Comfort, ventilation, lighting, acoustic privacy and cleanable finishes matter for client-facing use. PriviFilm may add switchable privacy to suitable glazing, subject to the glazing and electrical specification.
Choose standard, bespoke or the complete Forti Nova bundle
Compare the published frame catalogue using the listed dimensions, height information and openings. If the activity needs different geometry, request a bespoke frame. Suitable projects can combine ground screw installation, frame supply and professional erection, with discounted cladding, EPDM roofing and roofline options.

